Wastewater Sector | Minimal Downtime, Maximum Upgrade
ERG Hygrade refurbished the odour control system at United Utilities’ Birkenhead wastewater treatment works, replacing aging components with modern corrosion-resistant GRP and digitised dosing technology. The system – originally installed by ERG Hygrade in 2006 – continues to operate with improved performance and full operational continuity during the works.
Key Deliverables: GRP dampers, digital dosing cabinets, carbon bed upgrade, stainless steel internals replaced
Location: Birkenhead, UK
Client Since: 2006
Read the full case study here: Odour Control Unit Refurbishment and Upgrades – Wastewater